3/12 roof pitch over a 48 ft span

3/12 pitch over a 48 ft span
24.74ft rafter
14° · ridge sits 6 ft above the wall plate
14°24 ft run6 ft rise24.74 ft rafter3/1225% · 14°× 1.031footprint → roof areaDouble underlayment
Rafter length24 ft half-span × 1.03124.74ft
With a 12″ overhangwhat you actually cut25.77ft
Ridge height above the wall6ft
Pitch factor√(1 + (3/12)²) — multiply footprint by this for roof area1.031
Angleset the mitre saw to this14°
As a percentage3/12 is 25%, not 3%25%
Roof area per 100 ft² of footprint103ft²
Asphalt shingleIRC R905.2.7 — 2/12 to 4/12 requires two layersDouble underlayment
Walkableproper footwear and a harnessYes, with care
Pitch
3 /12
Span
48 ft

Three ways of saying the same slope

3/12 means 3 inches of rise for every 12 inches of run. As an angle that is 14°. As a percentage it is 25%.

People quote one and mean another constantly. 3/12 is not 3%, and it is not 3° either.

What you actually cut

The rafter is the hypotenuse, so it is always longer than the half-span. Over a 48 ft span the half-run is 24 ft and the rafter is 24.74 ft — plus the overhang, giving 25.77 ft to cut.

The ridge sits 6 ft above the wall plate.

The number worth keeping

The pitch factor is 1.031. Multiply any footprint by it to get roof area: 100 ft² on the ground is 103 ft² of roof at this pitch.

That single number is the difference between ordering enough shingle and ordering the footprint.

Where the pitch decides the material

Below 2/12, asphalt shingles are not permitted at all — water moves too slowly and wind drives it back under the courses. That roof needs a low-slope membrane.

Between 2/12 and 4/12, shingles are allowed but the IRC requires two layers of underlayment (R905.2.7). It is the most commonly skipped requirement on shallow roofs and the one that surfaces as a leak two winters later.

At 4/12 and above, a single layer is enough.

And where it decides the day rate

Above 8/12 most people cannot stand on a roof. Roof jacks, planks or scaffolding change the cost of the job more than any material choice does.

Notes

  • **Three ways of saying pitch, and they are not the same number.** 3/12 means 3 inches of rise per 12 inches of run. As an angle that is 14°. As a percentage it is 25%. People routinely quote one and mean another, and on a roof that mistake is expensive.
  • The rafter is the hypotenuse, so it is always longer than the half-span: 24 ft of run becomes 24.74 ft of rafter, plus 1.03 ft for a 12″ overhang. Cut to 25.77 ft and trim on the roof rather than the other way round.
  • Between 2/12 and 4/12 the IRC requires **two layers of underlayment** under asphalt shingles (R905.2.7). It is the single most commonly skipped requirement on shallow roofs, and it is the one that shows up as a leak two winters later.
  • The pitch factor 1.031 is the number to keep: multiply any footprint by it to get roof area. A 100 ft² footprint is 103 ft² of roof at this pitch.
  • 3/12 is walkable with proper footwear and a harness. Wet, mossy or frosted, none of that holds.