ShingleTallySquares, bundles and everything else a roof needs, counted properly.

1/12 roof pitch over a 48 ft span

1/12 pitch over a 48 ft span
24.08ft rafter
4.8° · ridge sits 2 ft above the wall plate
4.8°24 ft run2 ft rise24.08 ft rafter1/128.3% · 4.8°× 1.004footprint → roof areaNo shingles below 2/12
Rafter length24 ft half-span × 1.00424.08ft
With a 12″ overhangwhat you actually cut25.09ft
Ridge height above the wall2ft
Pitch factor√(1 + (1/12)²) — multiply footprint by this for roof area1.004
Angleset the mitre saw to this4.8°
As a percentage1/12 is 8.3%, not 1%8.3%
Roof area per 100 ft² of footprint100ft²
Asphalt shinglebelow 2/12 needs a low-slope membrane, not shinglesNot permitted
Walkableproper footwear and a harnessYes, with care
Pitch
1 /12
Span
48 ft

Three ways of saying the same slope

1/12 means 1 inches of rise for every 12 inches of run. As an angle that is 4.8°. As a percentage it is 8.3%.

People quote one and mean another constantly. 1/12 is not 1%, and it is not 1° either.

What you actually cut

The rafter is the hypotenuse, so it is always longer than the half-span. Over a 48 ft span the half-run is 24 ft and the rafter is 24.08 ft — plus the overhang, giving 25.09 ft to cut.

The ridge sits 2 ft above the wall plate.

The number worth keeping

The pitch factor is 1.004. Multiply any footprint by it to get roof area: 100 ft² on the ground is 100 ft² of roof at this pitch.

That single number is the difference between ordering enough shingle and ordering the footprint.

Where the pitch decides the material

Below 2/12, asphalt shingles are not permitted at all — water moves too slowly and wind drives it back under the courses. That roof needs a low-slope membrane.

Between 2/12 and 4/12, shingles are allowed but the IRC requires two layers of underlayment (R905.2.7). It is the most commonly skipped requirement on shallow roofs and the one that surfaces as a leak two winters later.

At 4/12 and above, a single layer is enough.

And where it decides the day rate

Above 8/12 most people cannot stand on a roof. Roof jacks, planks or scaffolding change the cost of the job more than any material choice does.

Notes

  • **Three ways of saying pitch, and they are not the same number.** 1/12 means 1 inches of rise per 12 inches of run. As an angle that is 4.8°. As a percentage it is 8.3%. People routinely quote one and mean another, and on a roof that mistake is expensive.
  • The rafter is the hypotenuse, so it is always longer than the half-span: 24 ft of run becomes 24.08 ft of rafter, plus 1 ft for a 12″ overhang. Cut to 25.09 ft and trim on the roof rather than the other way round.
  • **Below 2/12 asphalt shingles are not permitted at all.** Water moves too slowly and wind drives it back under the courses. This roof needs a low-slope membrane — modified bitumen, TPO or EPDM — and that is a different trade with different detailing.
  • The pitch factor 1.004 is the number to keep: multiply any footprint by it to get roof area. A 100 ft² footprint is 100 ft² of roof at this pitch.
  • 1/12 is walkable with proper footwear and a harness. Wet, mossy or frosted, none of that holds.

Nearby sizes